33kV powerline extension & E&I installation

Oracle Energy was awarded the contract for a new 33kV powerline extension supporting an infrastructure mine deposit for Iluka Resources.

33kV

Network voltage

3.5km

Line extension

2022–23

Delivered

Iluka

Client

HV, LV & substation

Assets covered

Severity ranked

Reporting

Registers & certificates

Compliance

Emergency fault

Response

Iluka Resources: Eneabba Rare Earth Infrastructure Expansion

The project included supply and installation of a 3.5km extension to the existing 33kV distribution powerline to supply new and relocated mining loads.

The scope consisted of all supervision, scheduling, labour, plant and equipment, materials, consumables, testing and commissioning to deliver the works in accordance with site standards and statutory requirements.

Because the extension tied into a live distribution network on an operating site, sequencing and switching were planned around the client’s production program rather than ours.

Supply & installation

3.5km 33kV distribution extension, poles, conductors, hardware and terminations.

E&I installation

Electrical and instrumentation works for new and relocated mining loads.

Supervision & scheduling

Full site supervision, program management and statutory coordination.

Testing & commissioning

Commissioning against site standards and statutory requirements, documented on handover.

How it was delivered

Four phases, one contractor, one point of accountability from mobilisation to energisation.

Planning & procurement

Route confirmation, material procurement and a program built around the client’s production schedule and access windows.

Mobilisation

Our own prime movers, cranes, borers and elevated work platforms mobilised from Narngulu with experienced operators.

Construction

3.5km of 33kV distribution line constructed, with E&I installation for new and relocated loads.

Testing, commissioning & handover

Testing and commissioning completed in accordance with site standards and statutory requirements, with documentation handed over on completion.

What the client got

Capacity for the new deposit, delivered inside the operating environment it had to serve.

Out / 01

New and relocated loads energised

The extension delivered supply to new and relocated mining loads without interrupting the existing distribution network.

Out / 02

One contract, one accountability

Supervision, labour, plant, materials, consumables, testing and commissioning all held under a single scope.

Out / 03

Compliant on handover

Delivered in accordance with site standards and statutory requirements, with commissioning documentation complete.

Delivery you can verify

Midwest WA · 2021–22

Water Corporation: bore field backup generation

Two centralised generation compounds backing the bore field 33kV network, delivered through to wet commissioning.

Midwest WA · 2021

Image Resources: overhead powerline construction

A new 2km powerline enabling the expansion of mining operations.

Midwest WA · 2020–21

Western Power: Durlacher 61 & 62 removal

Removal and decommissioning of two transmission lines with distribution assets.

Got an upcoming project?

Include Oracle Energy when planning your next development. We’ll help establish your electrical infrastructure needs and make informed recommendations to meet your project goals.